Over the past week or so I’ve completed a pile of small projects, things that have been sitting around for a while….

  • I finally got the insulation into the ceiling above the desk in the loft, making for a *hopefully* better working environment…
  • The 737/Saitek Throttle Quadrant is now mounted on it’s 45º offset mount, making it a bit more 737-ish
  • The stairs have all their “risers” in place, and a trim panel along the edge.  Just needs a couple of gaps filled before winter…
  • The loft has gained a 20″ Monitor as a cloned display from the laptop (for MotoGP watching, or Control Tower views…)
  • After *another* throw-out the 737 panel has now moved closer to being ready to bolt together in the loft.

All-in-all, lots of little things, but things are nicely ticking along 🙂   Not much to show graphically, but still good to see.

By SeanG

One thought on “A week of small projects”

Leave a Reply

Your email address will not be published. Required fields are marked *