Over the past week or so I’ve completed a pile of small projects, things that have been sitting around for a while….
- I finally got the insulation into the ceiling above the desk in the loft, making for a *hopefully* better working environment…
- The 737/Saitek Throttle Quadrant is now mounted on it’s 45º offset mount, making it a bit more 737-ish
- The stairs have all their “risers” in place, and a trim panel along the edge. Just needs a couple of gaps filled before winter…
- The loft has gained a 20″ Monitor as a cloned display from the laptop (for MotoGP watching, or Control Tower views…)
- After *another* throw-out the 737 panel has now moved closer to being ready to bolt together in the loft.
All-in-all, lots of little things, but things are nicely ticking along 🙂 Not much to show graphically, but still good to see.
Well done buddy